1- Control of documents that include :
• Control the issuance and distribution of new documents
• Change the documents of the Quality Management System
• Control the obsolete document copy of the Quality Management System
2- Implementation of Internal Audit process on the Quality Management System to verify the following :
• Conformity of Quality Management Procedure with ISO requirements
• Apply the Procedure of Quality Management System Effectively
• Providing internal audit reports to QHSE Manager
• Should perform the Audit function in the site and make proper follow up on the Audit Documents.
3- Following up the implementation of Management Review Meeting includes :
• Invite the concerned employee to attend the meeting
• Documents the minutes of meeting
• Documents the Corrective /Preventive Action
4- Corrective / Preventive action.
• Reports the non conformity and the causes of the problem.
• Study and analyze the corrective actions and reports the results in the Management Review Meeting.
Job Details
| Date Posted: | 2016-11-02 |
| Job Location: | Kuwait |
| Job Role: | Engineering |
| Company Industry: | Construction |
Preferred Candidate
| Career Level: | Mid Career |
| Degree: | Bachelor's degree |
Apply Now - Jobs in Kuwait - Engineering Jobs in Kuwait - Search All Jobs

Post a Comment